Short Outage Window Recompression

Evacuate a 7.6 mile long 12” OD pipeline at 660 psig as fast as possible to reduce a customer’s power plant downtime

Two ReCo units moved 1.5 MMSCF of gas in 6 hours from the outage pipeline in the middle of the night.

Result:

Client was able to complete their maintenance project, reduce their emissions significantly, and avoid a major service disruption to their power plant customer