An urgent operational upgrade required the evacuation of 65 miles of 36-inch pipeline within a strict 48-hour timeline. The goal was to capture all gas product without emissions and minimize system downtime.
Case
Studies
Case
Studies
Discover what ReCo can do for you by looking through our history of case studies.
An urgent operational upgrade required the evacuation of 65 miles of 36-inch pipeline within a strict 48-hour timeline. The goal was to capture all gas product without emissions and minimize system downtime.
ReCo initiated pressure reduction from 732 PSIG down to 19 PSIG using a multi-unit mobile compression configuration specifically designed for high-volume systems.
Result:
More than 57 MMSCF was successfully evacuated within the tight deadline. The speed and effectiveness of this project underscore ReCo’s leadership in time-sensitive natural gas compression.