High Starting Pressure

ReCo Energy Solutions successfully evacuated an 8.54-mile, 14-inch OD pipeline with an exceptionally high starting pressure of 1027 PSIG. In just 11.8 hours, the team transferred 3.5 MMSCF of natural gas into an active in-service line, ensuring safety, efficiency, and environmental compliance.

Freezing Weather Operation

ReCo Energy Solutions successfully evacuated a 20.43-mile, 30-inch OD pipeline during a severe winter storm. Despite freezing conditions, the team safely transferred 20.7 MMSCF of natural gas in just two days, achieving the target pressure of 78 PSIG while maintaining safety and meeting the client’s schedule.

Achieving Low Ending Pressure

ReCo Energy Solutions efficiently evacuated an 8.3-mile pipeline, achieving a final pressure of 0 PSIG in just 36 hours. This project showcased precision, minimized downtime, and reinforced environmental responsibility.

Low Target Pressure Case Study

ReCo Energy Solutions evacuated a 19-mile, 22-inch OD pipeline, reducing pressure from 610 PSIG to 1 PSIG. This enabled anomaly dig-driven pipe replacements while minimizing environmental impact.

Pigging Pull for Pipeline In Line Inspection

A natural gas pipeline and distribution operator utilized ReCo Energy Solutions’ temporary compression to facilitate multiple smart pig runs by moving gas ahead of the pig.

Short Outage Window Recompression

ReCo Energy Solutions swiftly evacuated a 7.6-mile, 12-inch OD pipeline at 660 PSIG to minimize a power plant’s downtime during scheduled maintenance.

Talk To Our Industry Experts

Our support team is on hand and ready to answer any and all
questions you may have regarding our services.
Our support team is on hand and ready to answer any and all questions you may have regarding our services.