Cross Compression

Small Volume Fast Recompression (Pig Traps and Receivers)

The project required evacuating gas from pigging launchers and receivers throughout the ILI process. Using a mobile recompression unit, gas was transferred back into the main pipeline, reducing emissions and operational downtime.

A single small-volume evacuation unit was deployed between launch and receive sites, efficiently recompressing gas from barrels and nominal pipe assemblies back into the main line. Starting pressures ranged from 580 to 680 PSIG, with ending pressures as low as 0 PSIG in approximately 20 minutes. Setup and breakdown averaged under an hour per site, ensuring minimal project disruption.

Result:

The client successfully avoided venting most of the trapped gas, significantly reducing emissions while keeping additional costs and time constraints to a minimum. This approach optimized environmental compliance and project efficiency.

Key Takeaways:

  • Rapid Gas Recovery: Achieved 0 PSIG in about 20 minutes per site.
  • Minimal Downtime: Setup and breakdown averaged under an hour.
  • Emission Reduction: Prevented unnecessary gas venting.
  • Cost Efficiency: Maintained project schedule with minimal added expenses.

For efficient pigging operations, visit ReCo Energy Solutions.

Others

Talk To Our Industry Experts

Recompression
Our support team is on hand and ready to answer any and all
questions you may have regarding our services.
Our support team is on hand and ready to answer any and all questions you may have regarding our services.