ReCo Energy Solutions was brought in to provide rapid response evacuation services for a 9-mile section of 10-inch natural gas pipeline. The pipeline was scheduled for urgent maintenance, and the client required near-total depressurization within a single workday.
Starting at a pressure of 764 PSIG, ReCo utilized its rapid-deployment mobile compression units to reduce the pressure to just 0.2 PSIG in under 9 hours.
1.5 MMSCF of gas was safely transferred. This minimized operational disruptions and eliminated the need for emergency flaring. The project demonstrated ReCo’s unique ability to perform agile, responsive evacuations that maintain compliance without sacrificing speed or efficiency.